Development Spreadsheet Create S-CURVE to Check Work Progress of Construction for Supervisors

Authors

  • สาธร เบญจชาด
  • สุภาดา ศรีสารคาม

DOI:

https://doi.org/10.14456/jmu.2015.15

Keywords:

Work Progress, S-Curve Create, S-Curve by Microsoft Excel

Abstract

        A progress report of the construction has the principle idea is the amount of work that the contractor can actually do convert to the money of the contract and make a comparison with the proposed work plan, it will know that the progress of work at the time slow or faster than plan. However, because of construction work, each job has several work items. A separate calculation for each item are complicated and use many time so the researchers develop Microsoft Excel in the name S-Curve CREATER as a tool to calculate the work progress quickly and accuracy. Researchers have put the formula in Excel file to create a display format to make it easier to use and make the actual trial in project that the researcher is supervisor, the results that found are the program can calculate the work progress and create a graph S-Curve comparison between work performance and work schedule.  Although it will take many time to fill the beginning information but a summary of the work can be done easily by using a short time and the users don't need to expert in Excel.

References

ยุทธนา เกาะกิ่ง. (2555). คู่มือการใช้ MS Project 2007 บริหารโครงการก่อสร้าง. TUMCIVIL.COM.

ธนินพัชร์ ทองธนาวัฒน์. (2555). การใช้โปรแกรมSPREADSHEET สำหรับคำนวณเพื่อเร่งรัดงานใน S-CURVE. วิทยานิพนธ์ ปริญญาวิศวกรรมศาสตร์มหาบัณฑิต การบริหารงานก่อสร้างและสาธารณูปโภค สาขาวิชาวิศวกรรมโยธา สำนักวิชาวิศวกรรมศาสตร์ มหาวิทยาลัยเทคโนโลยี สุรนารี.

ประสาน รัตนสาลี. (2557). การสร้าง S-Curve เพื่อติดตามงานสร้างโดย MS excel (S-Curve for monitoring). บริษัท PSMC จำกัด.

Downloads

Published

2015-12-28

Issue

Section

Research Articles