The Program Development for Escalation Factor (K) Calculation by Spreadsheet Program

Authors

  • พร้อมพงศ์ ผุงเพิ่มตระกูล
  • สาธร เบญจชาด

DOI:

https://doi.org/10.14456/jmu.2016.3

Keywords:

Escalation Factor Calculation, K value Calculation Program

Abstract

          Now the constructions in Mahidol University are considered price adjustment contracts. The contracts calculate the escalation factor (K Value) manually or using computer programs. The researcher is responsible for verifying the calculation of K values of construction projects of all institutes within Mahidol University, resulting in the difficulty and time-consuming of work. In addition, the available computer program no longer used for calculating since the cabinet resolution regarding the K value calculation became effective. Therefore, the researchers developed “MUCAL K” for calculating and verifying the K value of many construction projects in Mahidol University. The result found that the program is effective reliable, user - friendly and fast - processing.

References

ส่วนมาตรฐานสิ่งก่อสร้างสำนักมาตรฐานงบประมาณ . (2544). คู่มือการตรวจสอบเงินชดเชยค่างานก่อสร้าง (ค่า K) มติคณะรัฐมนตรีและหนังสือเวียนที่เกี่ยวข้อง.สำนักงบประมาณ, กรุงเทพฯ.

ถิระวัฒน์ อยู่เกษม. (2553). ปัญหาการคำนวณเงินชดเชยค่างานก่อสร้าง: กรณีศึกษาปี 2551. การศึกษาค้นคว้าอิสระ ปริญญาวิศวกรรมศาสตรมหาบัณฑิต สาขาวิศวกรรมโครงสร้างพื้นฐานและการบริหาร ภาควิชาวิศวกรรมโยธา มหาวิทยาลัยเกษตรศาสตร์,กรุงเทพฯ.

สำนักดัชนีเศรษฐกิจการค้า, ดัชนีราคาที่ใช้ในการคำนวณค่า K. กระทรวงพาณิชย์, กรุงเทพฯ

Downloads

Published

2016-06-27

Issue

Section

Research Articles