Design and development of semi-automatic machine for productivity increasing in a shrink tube heating process

Main Article Content

Kedsarin Phoonsup
Pratchayaporn Danpong
U-krit Pinbunditsub
Wanchai Leelakaweewong

Abstract

This project aimed to reduce waste and increase productivity in shrink tube heating process. An analysis of wiring harness process points out that a shrink tube heating process has the highest cycle time and do not have any work standards. Moreover, operators in this process always have fatigue problems because of a repetition of activities in the workflow. An analysis of causes of problems and a finding out solutions shows that the process can be developed by designing a shrink tube heating machine. The shrink tube heating machine is designed by using a principle of jig and fixture design. A Rapid Upper Limp Assessment technique (RULA) is used to assess the operator’s fatigue. The results show that a shrink tube heating machine can help to reduce the process cycle time from 23.49 minutes to 19.48 minutes or a decrease of 17.07%, that leads to an increase of productivity of 23.5%. It can also help to reduce a RULA level from 4 to 1, that means the shrink tube heating machine can help to reduce operator’s fatigue.

Article Details

Section
Original Articles

References

กรมการขนส่งทางบก.Transportation Statistics Report [ออนไลน์]. เข้าถึงได้จาก

https://www.m-society.go.th/article_attach/19286/20656.pdf.

กวีพล พันธุ์เพ็ง. SCB Economic Intelligence Center (EIC) [ออนไลน์]. เข้าถึงได้จาก

https://www.scbeic.com/th/detail/file/product/1514/e6f5k0v5z9/Note_TH_Automotive%20part%20manufacturers_TR_KP_20150714_final_rev2.pdf

ประจวบ กล่อมจิตร. การประเมินและปรับปรุงงานในสถานประกอบการโดยหลักการยศาสตร์. พิมพ์ครั้งที่ 1สำนักพิมพ์ โรงพิมพ์มหาวิทยาลัยศิลปากร; 2554.

รัชต์วรรณ กาญจนปัญญาคม.การศึกษาการเคลื่อนไหวและเวลา. สำนักพิมพ์ฟิสิกส์เซ็นเตอร์; 2538.

วชิระ มีทอง. การออกแบบจิ๊กและฟิกซ์เจอร์. พิมพ์ครั้งที่ 12. สมาคมส่งเสริมเทคโนโลยี (ไทย-ญี่ปุ่น); 2545.